{"id":7721,"date":"2024-07-09T16:18:39","date_gmt":"2024-07-09T16:18:39","guid":{"rendered":"https:\/\/rahbarkisan.com\/wp\/?p=7721"},"modified":"2024-07-09T16:18:57","modified_gmt":"2024-07-09T16:18:57","slug":"ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower","status":"publish","type":"post","link":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/","title":{"rendered":"NTDC completes 75 km long 500 KV  Transmission Line for evacuation of 884 MW of inexpensive hydropower:"},"content":{"rendered":"<p>Altaf Hamid Rao.<\/p>\n<p>Power project:<\/p>\n<p>MIRPUR ( AJK): July 09: The state-run National Transmission and Despatch Company Limited (NTDC) has achieved another major milestone as the construction of 75 kilometer long, 500 kV Double-Circuit Suki Kinari Transmission Line has been completed to evacuate 884MW cheap Hydropower, official sources said<\/p>\n<p>Central media wing of the NTDC told our Special Jammu and Kashmir state Correspondent Altaf Hamid Rao on Tuesday that this transmission line will facilitate the evacuation of 884 MW cheap and environment friendly electricity from the Suki Kinari Hydro Power project, located on River Kunhar in Mansehra district of Khyber Pakhtunkhwa, to the interconnection point of existing 500 kV Neelum Jhelum transmission line.<\/p>\n<p>Construction work on the transmission line was commenced in July 2021. Under the instructions of NTDC management, the pace of work on the project was accelerated in recent months to meet the timelines. Despite harsh weather conditions and tough hilly terrain, all construction activities were completed timely, the NTDC media wing spokesperson told the news agency<\/p>\n<p>The Hipot testing of transmission line has been successfully completed and the results were found satisfactory. Completion of this project is a massive achievement for all stakeholders, working tirelessly to supply cheaper electricity to the public.<\/p>\n<p>This transmission line will further improve the situation of power distribution in the areas of IESCO and GEPCO. Suki Kinari transmission line will strengthen the power transmission network of NTDC and play its role in promoting industrialization, creating employment opportunities and improving the socio-economic conditions of the country through uninterrupted power supply to the region.<\/p>\n<p>Meanwhile Deputy Managing Director (P&amp;E), Engr. Qaiser Khan, Deputy Managing Director (AD&amp;M), Engr. Muhammad Mustafa and Deputy Managing Director (SO), Engr. Muhammad Waseem Younas have congratulated the concerned project team on completion of the transmission line, the NTDC media wing man said.<\/p>\n<div id=\"rahba-3336628510\" style=\"width:300px;height:250px;background-color:#ddd;overflow:scroll;\">\n\t<strong>Ad debug output<\/strong>\n\t<br><br>\n\tThe ad is not displayed on the page<br><br>current post: NTDC completes 75 km long 500 KV  Transmission Line for evacuation of 884 MW of inexpensive hydropower:, ID: 7721<br><br><span style=\"color: red;\">Current post is not identical to main post.<\/span><br><br>Ad: Ad created on April 11, 2026 1:04 am (51053)<br \/>Placement: After Content (51146)<br><br>Display Conditions<div style=\"margin-bottom: 20px; white-space: pre-wrap; font-family: monospace; width: 100%; background: #ffe9e9;\"><strong>specific pages<\/strong><table border=\"1\"><thead><tr><th>Ad<\/th><th>wp_the_query<\/th><\/tr><\/thead><tr><td><\/td><td>post_id: 7721<br \/>is_singular: <\/td><\/tr><\/table><\/div>\t<br><br>\n\t<a style=\"color: green;\" href=\"https:\/\/wpadvancedads.com\/manual\/ad-debug-mode\/?utm_source=advanced-ads&utm_medium=link&utm_campaign=ad-debug-mode\" target=\"_blank\" rel=\"nofollow\">Find solutions in the manual<\/a>\n<\/div>\n<div id=\"rahba-1536093602\" style=\"width:300px;height:250px;background-color:#ddd;overflow:scroll;\">\n\t<strong>Ad debug output<\/strong>\n\t<br><br>\n\tThe ad is not displayed on the page<br><br>current post: NTDC completes 75 km long 500 KV  Transmission Line for evacuation of 884 MW of inexpensive hydropower:, ID: 7721<br><br><span style=\"color: red;\">Current post is not identical to main post.<\/span><br><br>Ad: Ad created on April 11, 2026 1:17 am (51056)<br \/>Placement: AfterContent (51054)<br><br>Display Conditions<div style=\"margin-bottom: 20px; white-space: pre-wrap; font-family: monospace; width: 100%; background: #ffe9e9;\"><strong>post type<\/strong><table border=\"1\"><thead><tr><th>Ad<\/th><th>wp_the_query<\/th><\/tr><\/thead><tr><td><\/td><td>post<\/td><\/tr><\/table><\/div>\t<br><br>\n\t<a style=\"color: green;\" href=\"https:\/\/wpadvancedads.com\/manual\/ad-debug-mode\/?utm_source=advanced-ads&utm_medium=link&utm_campaign=ad-debug-mode\" target=\"_blank\" rel=\"nofollow\">Find solutions in the manual<\/a>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Altaf Hamid Rao. Power project: MIRPUR ( AJK): July 09: The state-run National Transmission and Despatch Company Limited (NTDC) has achieved another major milestone as the construction of 75 kilometer long, 500 kV Double-Circuit Suki Kinari Transmission Line has been completed to evacuate 884MW cheap Hydropower, official sources said Central media wing of the NTDC [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,10,11],"tags":[],"class_list":["post-7721","post","type-post","status-publish","format-standard","hentry","category-english","category-kashmir","category-snippets"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower: - Daily Rahbar Kisan Internation<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:\" \/>\n<meta property=\"og:description\" content=\"Altaf Hamid Rao. Power project: MIRPUR ( AJK): July 09: The state-run National Transmission and Despatch Company Limited (NTDC) has achieved another major milestone as the construction of 75 kilometer long, 500 kV Double-Circuit Suki Kinari Transmission Line has been completed to evacuate 884MW cheap Hydropower, official sources said Central media wing of the NTDC [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/\" \/>\n<meta property=\"og:site_name\" content=\"Daily Rahbar Kisan Internation\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/RahbarKisanIntl\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-09T16:18:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-09T16:18:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rahbarkisan.com\/wp\/wp-content\/uploads\/2024\/05\/pdfrklogo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"886\" \/>\n\t<meta property=\"og:image:height\" content=\"530\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editor Rahbar Kisan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@rahbarkisan\" \/>\n<meta name=\"twitter:site\" content=\"@rahbarkisan\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editor Rahbar Kisan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/\"},\"author\":{\"name\":\"Editor Rahbar Kisan\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#\\\/schema\\\/person\\\/69cdfb97992e8b12f971f21317184c6e\"},\"headline\":\"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:\",\"datePublished\":\"2024-07-09T16:18:39+00:00\",\"dateModified\":\"2024-07-09T16:18:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/\"},\"wordCount\":313,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#organization\"},\"articleSection\":[\"English\",\"Kashmir - \u0627\u0653\u0632\u0627\u062f \u062c\u0645\u0648\u06ba \u06a9\u0634\u0645\u06cc\u0631\",\"Snippets\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/\",\"url\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/\",\"name\":\"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower: - Daily Rahbar Kisan Internation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#website\"},\"datePublished\":\"2024-07-09T16:18:39+00:00\",\"dateModified\":\"2024-07-09T16:18:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#website\",\"url\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/\",\"name\":\"Daily Rahbar Kisan Internation\",\"description\":\"At &#039;Your World in Words,&#039; we share stories from all over the world to make friends, spread good news, and help everyone understand each other better.\",\"publisher\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#organization\"},\"alternateName\":\"RKI\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#organization\",\"name\":\"Daily Rahbar Kisan Internation\",\"url\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/pdfrklogo.jpg\",\"contentUrl\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/pdfrklogo.jpg\",\"width\":886,\"height\":530,\"caption\":\"Daily Rahbar Kisan Internation\"},\"image\":{\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/RahbarKisanIntl\",\"https:\\\/\\\/x.com\\\/rahbarkisan\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/#\\\/schema\\\/person\\\/69cdfb97992e8b12f971f21317184c6e\",\"name\":\"Editor Rahbar Kisan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g\",\"caption\":\"Editor Rahbar Kisan\"},\"sameAs\":[\"http:\\\/\\\/rahbarkisan.com\"],\"url\":\"https:\\\/\\\/rahbarkisan.com\\\/wp\\\/author\\\/editor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower: - Daily Rahbar Kisan Internation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/","og_locale":"en_US","og_type":"article","og_title":"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:","og_description":"Altaf Hamid Rao. Power project: MIRPUR ( AJK): July 09: The state-run National Transmission and Despatch Company Limited (NTDC) has achieved another major milestone as the construction of 75 kilometer long, 500 kV Double-Circuit Suki Kinari Transmission Line has been completed to evacuate 884MW cheap Hydropower, official sources said Central media wing of the NTDC [&hellip;]","og_url":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/","og_site_name":"Daily Rahbar Kisan Internation","article_publisher":"https:\/\/www.facebook.com\/RahbarKisanIntl","article_published_time":"2024-07-09T16:18:39+00:00","article_modified_time":"2024-07-09T16:18:57+00:00","og_image":[{"width":886,"height":530,"url":"https:\/\/rahbarkisan.com\/wp\/wp-content\/uploads\/2024\/05\/pdfrklogo.jpg","type":"image\/jpeg"}],"author":"Editor Rahbar Kisan","twitter_card":"summary_large_image","twitter_creator":"@rahbarkisan","twitter_site":"@rahbarkisan","twitter_misc":{"Written by":"Editor Rahbar Kisan","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/#article","isPartOf":{"@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/"},"author":{"name":"Editor Rahbar Kisan","@id":"https:\/\/rahbarkisan.com\/wp\/#\/schema\/person\/69cdfb97992e8b12f971f21317184c6e"},"headline":"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:","datePublished":"2024-07-09T16:18:39+00:00","dateModified":"2024-07-09T16:18:57+00:00","mainEntityOfPage":{"@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/"},"wordCount":313,"commentCount":0,"publisher":{"@id":"https:\/\/rahbarkisan.com\/wp\/#organization"},"articleSection":["English","Kashmir - \u0627\u0653\u0632\u0627\u062f \u062c\u0645\u0648\u06ba \u06a9\u0634\u0645\u06cc\u0631","Snippets"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/","url":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/","name":"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower: - Daily Rahbar Kisan Internation","isPartOf":{"@id":"https:\/\/rahbarkisan.com\/wp\/#website"},"datePublished":"2024-07-09T16:18:39+00:00","dateModified":"2024-07-09T16:18:57+00:00","breadcrumb":{"@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/rahbarkisan.com\/wp\/ntdc-completes-75-km-long-500-kv-transmission-line-for-evacuation-of-884-mw-of-inexpensive-hydropower\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/rahbarkisan.com\/wp\/"},{"@type":"ListItem","position":2,"name":"NTDC completes 75 km long 500 KV Transmission Line for evacuation of 884 MW of inexpensive hydropower:"}]},{"@type":"WebSite","@id":"https:\/\/rahbarkisan.com\/wp\/#website","url":"https:\/\/rahbarkisan.com\/wp\/","name":"Daily Rahbar Kisan Internation","description":"At &#039;Your World in Words,&#039; we share stories from all over the world to make friends, spread good news, and help everyone understand each other better.","publisher":{"@id":"https:\/\/rahbarkisan.com\/wp\/#organization"},"alternateName":"RKI","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rahbarkisan.com\/wp\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rahbarkisan.com\/wp\/#organization","name":"Daily Rahbar Kisan Internation","url":"https:\/\/rahbarkisan.com\/wp\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rahbarkisan.com\/wp\/#\/schema\/logo\/image\/","url":"https:\/\/rahbarkisan.com\/wp\/wp-content\/uploads\/2024\/05\/pdfrklogo.jpg","contentUrl":"https:\/\/rahbarkisan.com\/wp\/wp-content\/uploads\/2024\/05\/pdfrklogo.jpg","width":886,"height":530,"caption":"Daily Rahbar Kisan Internation"},"image":{"@id":"https:\/\/rahbarkisan.com\/wp\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/RahbarKisanIntl","https:\/\/x.com\/rahbarkisan"]},{"@type":"Person","@id":"https:\/\/rahbarkisan.com\/wp\/#\/schema\/person\/69cdfb97992e8b12f971f21317184c6e","name":"Editor Rahbar Kisan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/aa2a40847e0cd3c9daf62f4c9dd0b940654fe3a78aa2b25ec99d578155246304?s=96&d=mm&r=g","caption":"Editor Rahbar Kisan"},"sameAs":["http:\/\/rahbarkisan.com"],"url":"https:\/\/rahbarkisan.com\/wp\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/posts\/7721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/comments?post=7721"}],"version-history":[{"count":0,"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/posts\/7721\/revisions"}],"wp:attachment":[{"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/media?parent=7721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/categories?post=7721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rahbarkisan.com\/wp\/wp-json\/wp\/v2\/tags?post=7721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}